The Humber Bridge opened by M.H. the Queen on 17th July 1981. Technical details of this bridge: Main Span: 1,410m. Side Spans: North Bank 280m, South Bank: 530m. Total Length: 2,220m. Clearance over water: 30m. Weight of Steel: 30,000 tonnes.
The Humber Bridge opened by M.H. the Queen on 17th July 1981. Technical details of this bridge: Main Span: 1,410m. Side Spans: North Bank 280m, South Bank: 530m. Total Length: 2,220m. Clearance over water: 30m. Weight of Steel: 30,000 tonnes.